Sunday, 20 October 2013

Week 6 – Install all the parts to body frame

Objective for this week :

  • To assembles circuit, motor and solar panel on the body frame.

Description:


Figure 1 : Wiring for Main circuit and
 Battery charger circuit
  • This week I tried to assemble the circuits (main circuit and battery charger circuit), motor (for solar tracking system), sensors, limit switches and solar panel on the body frame.
  • All wires should be connected at the right place and need to tighten all screws to prevent the connection from the dislodged.
  • Test will be conducted next week.



Figure 2 : Project wiring

No comments:

Post a Comment